Subjective:
* All these are not exact questions. These are
prepared to the extent I remember.

1. You gave the software for independent testers. You
are responsible for Unit, Integration, System and
Acceptance testing. Explain about each testing methods
and tell which testing can be given to Independent
Testing and Which for development team.

2. Any 3 tools and vendor of the tools.

3. One question on Optimum testing

4. You developed Risk Plan, Test Plan, Test Scripts.
You are doing testing. At this point you got major
requirements change. What changes are required to
in-corporate these changes in your plan.

5. Explain about
Complexity Measures
Data Flow Analysis
Symbolic Execution

6. Acceptance Test Plan for “Inventory Control
Software”

7. COTS s/w, critical success factors.

8. Security Vulnerabilities for e-comm application

9. e-comm project is newly developed in your
organization. You are not able to test all types of
Operating Systems and Browsers. Prepare mitigation
plan.

10. V-Model

11. 5 important S/W quality factors, why do you think
they are important.

12. 5 important things you consider for writing test
plan, why do you think they are important.

13. One question on defect management

14. Difference between Acceptance and System Testing

15. Preventive, Detective and Corrective Controls

16. 3 important issues for wireless technology.

17. One question on Pareto Charts
Like gave a scenario for no. of critical, minor
and major bugs and no. of days to fix the bugs.
Analyze the scenario.


Objective:
* All these are not exact questions. These are
prepared to the extent I remember.


1. Which communication skill will be neglected by most
a. Reading
b. Listening
c. Writing

2. Therapeutic listening is
a. Sympathetic listening
b. Listening to pieces of information…

3. Which model demonstrates relation between 2 or more
parameters of effort, duration or resource?
a. Cost
b. Constraint
c. Function Point

4. In which model expertise can be used to estimate
cost
a. Top-Down
b. Expert Judgment
c. Bottom-Up

5. Two objective questions on responsibility
Like who is responsible in issuing IT policy, work
policy etc.

6. Fit for use is
a. Transcendent
b. Product Based
c. User Based
d. Value Based

7. Re-Use of data is done in which type of testing
(Similar type 2 questions. Re-Use, Retesting sort of
qs.)
a. Capture/Play back
b. System Testing
c. Regression Testing
d. Integration Testing

8. 1 qs. On configuration management / Change
Management / Version Control

9. In Acceptance testing, which data is used.
a. Test Cases
b. Use Case
c. Test Plan
10. In four components of FIT, reliability is included
in (Similar type 2 qs)
a. Data
b. People
c. Structure
d. Rules

11. Obligations of both contractual parties should be
spelled out in
a. What is done
b. Who does it
c. When it is done
d. How it is done

12. Dates on which Obligations need to be filled out
should be specified in
a. What is done
b. Who does it
c. When it is done
d. How it is done

13. Two questions on Internal Auditor, Internal
Control responsibilities

14. One question on ERM model

15. One question on Control Frame Work Model

16. Two questions on CMM 5 levels of maturity (Like in
which level controls are implemented…)